Opportunity timeline

PostedJun 25, 2026
DeadlineSep 20, 2026

In plain English

The Illinois Department of Natural Resources made an emergency purchase of steel sheet piling and corner connectors to stabilize a causeway at Horseshoe Lake State Park in Madison County. The order includes 44 new PZC 18 hot-rolled steel sheet piles, each 40 feet long, plus four 40-foot US 90 corner connectors. This is not an open solicitation; details are available on the BidBuy portal.

About this opportunity

This is NOT an open solicitation. This is public notice of an emergency purchase of materials to stabilize a causeway at Horseshoe Lake State Park in Madison County. The Illinois Department of Natural Resources (DNR) requires the Emergency Purchase of materials to stabilize a causeway at Horseshoe Lake State Park in Madison County. New PZC 18 Domestic Hot Rolled Steel Sheet Piling. Rolled in accordance with ASTM A-572 gr 50 specifications, uncoated. In singles with handling holes. 44 pieces. Length - 40. Weight per linear foot - 50.40. US 90 Corner Connectors. 4 pieces. Length - 40. Product must be new, unused, and free from defect. Delivery FOB destination - two flat bed loads, plus one…

Time remaining

Closes Sep 20, 2026

06Days
:
11Hours
:
08Min
:
24Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-567A4F