How to bid on New Dredging for USCG Cutter Eagle at New London City Pier
What the Coast Guard is buying
The U.S. Coast Guard needs a contractor to dredge a new berthing area at New London City Pier in New London, Connecticut. This work will support the CGC Eagle by deepening the area for tugboat assistance during mooring and unmooring.
The project involves removing approximately 3,700 cubic yards of dredged material for upland disposal and removing about 50 underwater piles. Dredging activities are restricted to October 1 through March 1, and navigation through the channel must remain open at all times. The estimated value is between $1 million and $5 million, with a 300-day performance period.
Key dates and what happens at the deadline
This solicitation was published on September 11, 2026. The deadline for submitting bids is October 15, 2026, at 2:00 PM ET. All bids must be received by this time.
A 20% bid guarantee is required with your submission. Performance and payment bonds will also be required for the awarded contract.
Who this opportunity suits
This opportunity is a 100% small business set-aside, making it suitable for small construction firms with experience in dredging and marine pile removal. Contractors should be familiar with environmental regulations for dredging in Connecticut, specifically the October 1 to March 1 time-of-year restriction.
Firms capable of managing upland disposal of dredged material and ensuring continuous navigation during operations will be well-suited for this project. Experience with federal government contracts and the associated bonding requirements is also beneficial.
How to respond
To access the solicitation documents, you will need to go to the System for Award Management (SAM.gov). Search for the opportunity there. You may need to click the link twice if the first click takes you to the portal's homepage.
Vendors must be registered in the System for Award Management (SAM.gov) database to be eligible for a federal government contract. You may need a free account on SAM.gov to view all documents, though some bids allow viewing without one.
Tips for preparing a competitive response
Carefully review all solicitation documents, including specifications and drawings, to fully understand the scope of work. Pay close attention to the environmental time-of-year restriction for dredging and the requirement to maintain navigation.
Provide a clear and detailed cost for dredging per cubic yard, as this will be used for any contract cost adjustments based on actual material removed. Ensure your bid addresses the removal of underwater piles and the disposal site logistics. Prepare your bid guarantee and understand the requirements for performance and payment bonds well in advance of the deadline.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from US Coast Guard; the original posting controls.