USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Opportunity timeline

In plain English
The U.S. Coast Guard wants a contractor to dredge a new berthing area at New London City Pier in New London County, Connecticut, to support CGC Eagle. The work includes removing about 3,700 cubic yards of dredged material for upland disposal and removing about 50 underwater piles. Dredging is limited to October 1 through March 1, and navigation must remain open; the estimated value is $1 million to $5 million with a 300-day performance period. This is a 100% small-business set-aside, with a 20% bid guarantee and performance and payment bonds required.
Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN #24014900. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to…
Time remaining
Closes Oct 15, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-38E229