Bid guide
How to bid on Natomas PP5 Pumping Plant Construction for USACE Sacramento District
What the agency is buying and why it matters
The United States Army Corps of Engineers (USACE) Sacramento District is seeking a contractor to demolish the existing Pumping Plant 5 (PP5) and construct a new pumping plant facility in Sacramento, California. This project is part of the American River Common Features, Natomas Basin Project.
The new facility will be built approximately 300 feet up the West Drainage Canal from the current location. Its purpose is to discharge stormwater from the canal into the Sacramento River after rainfall. This work is necessary to allow for levee improvements, including a seepage berm, adjacent levee, and raising discharge pipes, to be completed in Reach B of the Natomas Basin.
Key dates and what happens at the deadline
This solicitation was published on September 10, 2026. The deadline for proposals is September 29, 2026, at 12:00 PM ET. All required submission materials must be received by this time.
Four amendments have been issued for this solicitation. Vendors should review the full solicitation document and all amendments for any updated deadlines or submission requirements.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in demolishing existing structures and building new pumping plant facilities or similar water infrastructure projects. Contractors should be familiar with projects involving levee improvements and stormwater management systems.
Firms with a strong background in civil engineering and environmental construction, particularly those with experience working on federal projects, would be well-suited for this bid.
How to respond to this solicitation
To access the full solicitation details and documents, you will need to go to the original source portal. You may need to click the link twice if the first click takes you to the portal's homepage. A free account may be required to view all documents, though this is not always the case.
The point of contact for this solicitation is Antonina Beal, Contract Specialist. Her email is [email protected]. Always refer to the full solicitation document for all detailed instructions, clauses, and submission requirements.
Practical tips for a competitive response
Given the nature of this construction project, pay close attention to the technical specifications for both demolition and new construction. Ensure your proposal clearly outlines your approach to site preparation, construction methodology, and environmental compliance.
Review all four amendments carefully, as they may contain critical updates, clarifications, or changes to the original solicitation. Address all requirements specified in the amendments in your response. Highlight your firm's experience with similar projects, especially those involving complex site conditions or federal agencies. Provide clear evidence of your team's qualifications and capacity to complete the work on schedule and within budget.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.