Opportunity timeline

PostedSep 10, 2026
DeadlineSep 29, 2026

In plain English

The U.S. Army Corps of Engineers wants a contractor to demolish the existing Pumping Plant 5 and build a new pumping plant in Sacramento, California. The new facility will be located about 300 feet up the West Drainage Canal and will discharge stormwater to the Sacramento River. Four amendments have been issued; see the full solicitation for deadlines and submission requirements.

About this opportunity

*** Amendment 0004 has been issued ****** Amendment 0003 has been issued****** Amendment 0002 has been issued****** Amendment 0001 has been issued ***The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is issuing a solicitation for the requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate

Time remaining

Closes Sep 29, 2026

15Days
:
06Hours
:
07Min
:
35Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-E4DB47