Bid guide
How to bid on the Terminal 3 West Modernization East Exterior Wall for Turner Construction
What Turner Construction Company is buying
Turner Construction Company is looking for a prequalified subcontractor for the East Exterior Wall trade package as part of the San Francisco International Airport’s Terminal 3 West Modernization project. This work involves both design and construction services.
The scope of work includes metal stud framing, plaster, metal panels, glazing, and skylights. Structural demolition will be handled by other contractors. The estimated value for this trade package is $20 million.
Key dates and what happens at the deadline
The deadline for bids is September 14, 2026, at 5:00 PM Pacific Time. All proposals must be submitted by this time.
Before submitting your final proposal, bidders will need to develop and submit pre-proposal drawings for review to ensure alignment with project architectural and performance requirements.
Who this opportunity suits
This opportunity is suitable for construction firms with expertise in exterior wall systems, including metal stud framing, plaster, metal panels, glazing, and skylights. Firms should have design and engineering capabilities.
There is a 5% Local Business Enterprise (LBE) participation requirement for this project. Interested firms should contact Briana Padilla for details on both SFO and Turner prequalification criteria.
How to respond
To access the solicitation, you will need to go to the OpenGov Procurement portal. The first time you visit, a brief security check may occur before the project page loads.
You will need to sign in or create a free vendor account on OpenGov Procurement. This will allow you to download plans, ask questions, join the planholders list, and submit your response before the deadline. Addenda notices will also be sent through OpenGov.
Tips for preparing a competitive response
Given the design and construction nature of this package, clearly demonstrate your firm's experience in both areas. Highlight past projects where you successfully managed both the design and build phases for similar exterior wall systems.
Pay close attention to the pre-proposal drawing submission requirement. Ensure your preliminary designs clearly align with the project's architectural and performance needs. This early submission is crucial for demonstrating your understanding and capability.
Thoroughly review the SFO and Turner prequalification criteria by contacting Briana Padilla. Meeting these requirements is essential for your bid to be considered. Also, clearly outline how you will meet the 5% LBE participation requirement in your proposal.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Turner Construction Company; the original posting controls.

