Terminal 3 West Modernization - TP 173- East Exterior Wall

Opportunity timeline

In plain English
Turner Construction Company is seeking a prequalified subcontractor for the East Exterior Wall trade package on San Francisco International Airport’s Terminal 3 West Modernization. The work includes design and construction for metal stud framing, plaster, metal panels, glazing, and skylights; structural demolition will be done by others. Bids are due September 14, 2026, at 5:00 PM, with an estimated value of $20 million and a 5% LBE participation requirement. Contact Briana Padilla for SFO and Turner prequalification criteria.
Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 735,000 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Trade Package No.: 173 Trade Package Title: East Exterior Wall Description of the Trade Package Scope of Work: Turner is seeking to prequalify a subcontractor to…
Time remaining
Closes Sep 15, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-150C1C