What Harris County is buying

Harris County is seeking a contractor to build Spring Branch Trail Segment 04A. This project involves constructing a 10-foot-wide concrete trail from Chatterton Drive to north of Fullerton Drive.

The work includes subgrade stabilization, two mid-block crossings, four neighborhood connections, and a 48-inch reinforced concrete box (RCB) crossing of a drainage ditch. Landscape amenities are also part of the scope. Utility coordination with CenterPoint and Kinder Morgan is required, including three crossings of an existing 36-inch Kinder Morgan pipeline.

Key dates and deadlines

The deadline for submitting bids is September 17, 2026, at 1:00 PM ET. All bids must be submitted as directed by the project before this date and time. Late submissions will not be considered.

Who this opportunity suits

This invitation for bid (IFB) is suitable for construction firms with experience in trail building, concrete work, subgrade stabilization, drainage infrastructure, and utility coordination, particularly involving pipeline crossings. Companies familiar with public works projects in Texas, especially Harris County, would find this opportunity relevant.

How to respond to this solicitation

To access the project details, you need to go to CivCast. Viewing the project information is public. To download plans and specifications and to be added to the planholders list, you must register for a free CivCast account. This will also ensure you receive notices for any addenda.

Submit your bid as instructed by the project on CivCast before the deadline. Some projects accept electronic bids directly through CivCast, while others may require bids to be opened at the owner's office. Follow the specific instructions provided for this project.

Practical tips for a competitive response

Carefully review all plans, specifications, and addenda. Pay close attention to the detailed requirements for the concrete trail, subgrade stabilization, and all types of crossings, including the specific utility coordination needed for the Kinder Morgan pipeline.

Ensure your bid accurately reflects all labor, materials, and equipment costs. Account for potential challenges related to utility coordination and the specific site conditions. Double-check all calculations and ensure your submission is complete and error-free before the deadline.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.