Opportunity timeline

PostedAug 14, 2026
DeadlineSep 17, 2026

In plain English

Harris County wants a contractor to build Spring Branch Trail Segment 04A from Chatterton Drive to north of Fullerton Drive. The work includes a 10-foot-wide concrete trail, subgrade stabilization, two mid-block crossings, four neighborhood connections, a drainage-ditch crossing, landscaping, and utility coordination, including three crossings of a Kinder Morgan pipeline. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

Scope of work includes a 10-foot-wide concrete trail, subgrade stabilization, two mid-block crossings, four neighborhood connections, a 48" RCB crossing of a drainage ditch, and landscape amenities. Utility coordination with CenterPoint and Kinder Morgan will be required, including three crossings of an existing 36-inch Kinder Morgan pipeline. Posted by Halff on behalf of Harris County. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Sep 17, 2026

03Days
:
09Hours
:
57Min
:
46Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-40E57D