East Palm Canyon Bridge Project

Opportunity timeline

In plain English
The City of Palm Springs seeks a contractor to widen the East Palm Canyon Drive Bridge and complete related sidewalk, curb, storm drain, soundwall, utility, parking lot, pedestrian bridge, striping, and pavement work. An optional add alternate includes more pavement work and related adjustments. A California Class A contractor’s license is required; construction equipment cannot enter Palm Canyon Wash from March 1 through June 30, and all work must be done in daylight.
The base bid Work includes widening the existing East Palm Canyon Drive Bridge (including architectural treatment and lighting), CV Sync conduit installation, constructing new curb, gutter, and sidewalk, constructing a driveway and curb ramps, constructing a bus pad, constructing retaining walls, a new soundwall at the mobile home park, utility coordination including SCE capacitor bank relocation, storm drain improvements, improvements to the Araby parking lot, rehabilitating the pedestrian bridge deck and railings adjacent to the bridge, striping, and pavement rehabilitation. The add alternate Work includes additional cold plane and overlay limits, water valve adjustments, survey monument…
Time remaining
Closes Nov 20, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-7A0E60