Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Opportunity timeline

In plain English
The U.S. Army Corps of Engineers is seeking a contractor to replace the Navigation Lock 1 bridge at Bonneville Lock and Dam with a new steel-girder bridge and approach roads, and partially demolish the existing bridge. Access to the project must stay open during construction, which may require phased work; lead and asbestos removal and work within environmental and seasonal restrictions are also required. The solicitation closing date is October 29, 2026. Site visit attendees must be U.S. citizens with accepted identification.
*** 20 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): CHANGE IN SOLICITATION SPECIFICATIONS: Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS Paragraph 1.18.4 Traffic Control Plan (TCP) edited. CHANGE IN SOLICITATION ATTACHMENTS: Attachment A16 BN NL Bridge As Builts_combined drawings edited. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 14 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14…
Time remaining
Closes Oct 29, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E6669C