Shoe Palace Missouri City, TX

Opportunity timeline

In plain English
Interior work for a Shoe Palace store in Missouri City, Texas includes demolition, drywall and framing, mirrors, painting and wall covering, sprinkler changes, HVAC ductwork and testing and balancing, electrical work, fire alarm, window film, final cleaning, and a dumpster. Plans and specifications are available through the LDI online planroom; an account is required to download them, and printed sets are sold.
Trades Needed: Demolition: Interior Drywall: typical DW/metal framing, new partitions, include patching Glass/Glazing: mirrors Paint: interior painting, install wall covering Sprinkler: add & relocate heads per layout HVAC: new ductwork and T&B Electrical: as per drawings, install light fixtures provided by owner Fire Alarm Window Film (blackout) Final Clean Dumpster Project posted on the LDI online planroom. Plans and specifications are available from the planroom (account required to download; printed sets are sold).
Time remaining
Closes Oct 29, 2026



Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-27949D