Opportunity timeline

PostedOct 15, 2026
DeadlineNov 12, 2026

In plain English

The Port of Portland seeks a contractor to rehabilitate Portland International Airport’s North Runway and nearby taxiways. Work includes asphalt paving, runway and taxiway lighting and navigation aid upgrades, drainage, signage, markings, and construction of a new Taxiway A4. A pre-bid meeting is scheduled for October 22, 2026, at 10:00 AM; license requirements are in the project manual.

About this opportunity

1. Rehabilitation of Runway 10L-28R (North Runway) and shoulders in asphalt concrete pavement with mill and inlay. 2. Reconstruction of portions of the North Runway north shoulder pavement and sealing of the blast pad pavements. 3. Upgrade of Runway 10L navigation aids (NAVAIDs) to Category II/III. 4. Rehabilitation of pavement at Taxiways A1, A2, A3, A5, A6, K1, and T from the North Runway to the Runway 10L-28R hold bar, and widening of some existing shoulders. 5. Construction of Taxiway A4 in a new location and removal of the existing Taxiway A4 between the North Runway and Taxiway A. 6. Providing runway and taxiway edge and centerline lighting cans, conduit, and conductors. 7. Providing…

Time remaining

Closes Nov 12, 2026

14Days
:
16Hours
:
55Min
:
08Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-BDB2BF