Opportunity timeline
In plain English
Marion County seeks a contractor to remove existing guardrails and install new steel plate beam guardrails and posts on the Timber Trail, including excavation and backfilling. The estimated project cost is $100,000 to $250,000. See OregonBuys for the full documents and response details.
About this opportunity
ITB for Construction includes removing existing guardrail and installing new guardrail, as called for in the Plans and Specifications, and such Incidental Work as requested by the Engineer. The estimated project cost range is $100,000 to $250,000. 912-23-39 GUARD RAILS, STEEL PLATE BEAM. THIS WORK SHALL CONSIST OF FURNISHING AND ERECTING STEEL PLATE BEAM GUARDRAIL AND POSTS. THIS WORK ALSO INCLUDES EXCAVATION AND BACKFILLING. 912-23-40 GUARD RAILS, REMOVAL OF EXISTING AND REMOVAL AND RE-ERECTION OF.THIS WORK SHALL CONSIST OF THE REMOVAL AND DISPOSAL OF THE EXISTING METAL PLATE GUARDRAIL, WOOD GUARDRAIL, STEEL PLATE BEAM GUARDRAIL AND CABLE ROAD GUARD. 912-23-41 GUARD RAILS, REMOVAL AND…
Time remaining
Closes Nov 3, 2026
Related Opportunities

648-22-104 Correct HVAC Deficiencies (P&V)

Bend Shop Plasma Table

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Aerial Communication Pole Work, Pole Maintenance, Emergency Call Out Services, and Pole Violation Remediation

2026 ITB 18 Lincoln St: 5th Ave - 13th Ave (Eugene)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-4F2CF3

