In plain English
SamTrans wants sidewalks demolished and replaced with ADA-compliant shelter pads and sidewalks, plus new bus shelters installed at two stops: #344200 in Redwood City and #334537 in South San Francisco. A pre-bid meeting is scheduled for October 8, 2026, at 10:30 AM. Bids are submitted electronically through PlanetBids; free vendor registration is required to access the documents and respond.
About this bid
1. Demolition of sidewalks at Bus Stops #344200 in Redwood City, CA, and #334537 in South San Francisco, CA. 2. Recast/replace with ADA compliant Shelter pad and sidewalk at Bus Stops #344200 and #334537. 3. Procure, assemble, and install new bus shelters at Bus Stops #344200 and #334537. Refer to full RFQ package for full details under "Documents." Department: San Mateo County Transit District. Pre-bid meeting: October 8, 2026 at 10:30 AM. Solicitation 27S-CU-015 posted by San Mateo County Transit District (SamTrans) on PlanetBids. Documents, addenda and electronic bidding are on the PlanetBids listing (free vendor registration to download and respond).
Details
- Agency
- San Mateo County Transit District
- NAICS
- 237990 · Other Heavy and Civil Engineering Construction
- Classification (PSC)
- Other Heavy and Civil Engineering Construction; Poured Concrete Foundation and Structure Contractors; Structural Steel and Precast Concrete Contractors; Other Foundation, Structure, and Building Exterior Contractors; Other Building Equipment Contractors; Site Preparation Contractors; All Other Specialty Trade Contractors; Brick, Stone, and Related Construction Material Merchant Wholesalers
- Place of performance
- Millbrae, California
How to access this bid
Click “View the original posting” — it opens this bid on the agency’s PlanetBids portal, where the scope, dates and document list are public.
PlanetBids may ask you to complete a quick “confirm you are human” check before the page loads.
To download the documents, receive addenda and bid electronically, register a free PlanetBids vendor account with this agency, then submit before the due date.
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.


