Opportunity timeline

PostedSep 24, 2026
DeadlineNov 2, 2026

In plain English

The City of San Diego is seeking as-needed environmental services for stormwater system projects, including channel work, facility repairs, habitat restoration, invasive plant control, and green infrastructure. The city’s stormwater network covers a 342-square-mile area. Estimated value is $3 million per contract, and a pre-bid meeting is scheduled for October 8, 2026, at 10:00 AM.

About this opportunity

The City of San Diego (City) operates and maintains an extensive urban stormwater management system to convey stormwater and urban runoff for the purpose of reducing flood risk and improving water quality to provide essential public services, including the effective management of water resources in the City. The City's Municipal Separate Storm Sewer System (MS4) includes nearly 1000 miles of drainage pipes; 84 miles of drainage channels; over 48,000 storm drain structures; and 15 pump stations distributed over a 342 square-mile metropolitan area. The inspection, cleaning, maintenance, and repair of the MS4 is the responsibility of the Stormwater Department’s engineers, planners, and city…

Time remaining

Closes Nov 2, 2026

04Days
:
16Hours
:
07Min
:
58Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-CEE301