Opportunity timeline

PostedSep 13, 2026
DeadlineJan 25, 2027

In plain English

The government wants a contractor to build one 100,000-barrel JP-8 fuel storage tank at Yokota Air Base, Japan. Work includes a reinforced-concrete pump house, four 600-gpm fuel pumps, a 50-gpm water draw-off pump, piping, valves, controls, tank gauging, and a product recovery system. A site visit roster and pre-proposal conference slides were posted on September 14 and September 10, 2026.

About this opportunity

Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new…

Time remaining

Closes Jan 25, 2027

132Days
:
21Hours
:
14Min
:
07Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C1AEF1