Opportunity timeline

PostedSep 11, 2026
DeadlineSep 24, 2026

In plain English

The Department of the Army wants underground utility construction, including fuel-transfer, electrical, and communications conduits; pull boxes; grounding; roadway crossings; trenching; restoration; testing; and documentation. A site visit is scheduled for September 17, 2026, at 10:00 PM EDT, and quotations are due September 24, 2026, at 10:00 AM EDT. A bid guarantee is required, followed by performance and payment bonds; the estimated project size is $500,000 to $1,000,000.

About this opportunity

The requirement includes installation of underground fuel-transfer conduits, electrical conduit routes, communications conduit routes, pull boxes, grounding points, concrete-encased roadway crossings, open-cut trenching, backfill, compaction, stone-road restoration, testing, quality control, submittals, and closeout documentation. Site Visit: 17 September 2026,10:00 PM EDT, call 1SG Brian Persing at 614-336-6975 or CW2 Grant Stoner at 614-336-6580 with question regarding site visit. Do not contact them for any other questions. A valid photo ID is required to enter the installation. Questions Due: 17 September 2026, 5:00 PM EDT Quotation Due: 24 September 2026, 10:00 AM EDT Bonding: Bid…

Time remaining

Closes Sep 24, 2026

10Days
:
13Hours
:
20Min
:
46Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-633AEB