Opportunity timeline

PostedSep 12, 2026
DeadlineSep 24, 2026

In plain English

The City of Kirbyville wants drainage improvements along about 1,700 linear feet of the Herndon/MLK Ditch in Kirbyville, Texas. Work includes reshaping an earthen ditch, installing about 280 linear feet of reinforced box culverts, building concrete headwalls and riprap, and installing about 798 linear feet of metal beam guard fence. Traffic control, stormwater pollution prevention, trench safety, utility adjustments, and surface restoration are also included.

About this opportunity

SCOPE OF WORK Herndon/MLK Ditch The proposed project provides for the construction of drainage improvements (approx. 1700 linear feet) in the City of Kirbyville, Texas, including grading, reshaping and installing an earthen ditch, installing new reinforced box culverts, constructing new concrete headwalls/riprap, and associated improvements Specifically, the City intends to conduct the following improvements: Base Bid Items: Constructing 8’x3’ RCB culverts (approx. 253 linear feet), 4’x2’ RCB culvert (approx. 27 linear feet), including pipe penetrations through the box and all surface restoration all with stabilized backfill under roadway. Including reshaping the roadside ditches as…

Time remaining

Closes Sep 24, 2026

10Days
:
14Hours
:
41Min
:
04Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-A1F9B5