Uninterruptible Power Supply (UPS) systems and maintenance

Opportunity timeline

In plain English
The Louisiana Army National Guard wants a contractor to replace and maintain Liebert and EATON uninterruptible power supply systems. The work includes installing a 20KVA, 480V input/480V output system with at least 10 minutes of battery capacity at Jackson Barracks. Bidders must be manufacturer-certified authorized third-party vendors, use new OEM parts, and show they can obtain parts quickly. The solicitation closes September 25, 2026, at 8:00 a.m.
Louisiana Army National Guard is to replace its Uninterruptible Power Supply (UPS) systems and conduct maintenance in accordance with the attached PERFORMANCE WORK STATEMENT (PWS). The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Liebert and EATON UPS system maintenance, troubleshooting, and repair services, as defined in this PWS. In addition, the contractor shall install a 20KVA 480V INPUT 480V OUTPUT system with at least 10 MINUTE BATTERY capacity and the required batteries at the Jackson Barracks location, as specified in section 5.0.3.4. Proposals…
Time remaining
Closes Sep 25, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-14E064