Opportunity timeline
In plain English
Hardee County is seeking a contractor for the Callie Lane–Village Drive pavement project. The work includes installing nearly 280 tons of FDOT-specified asphalt friction course in a 1.5-inch layer, plus related work shown in the plans and specifications. Bid documents and responses are available through the DemandStar listing under solicitation ITB-26-012-0-2026/HS.
About this opportunity
Construction of the HARDEE COUNTY CALLIE LANE – VILLAGE DRIVE PAVEMENT PROJECT. The contractor shall be responsible for providing all materials, equipment and labor necessary for installation of nearly 280 tons of FDOT specified item 0337-7-83 Asphalt Concrete Friction Course, Traffic C, FC-12.5, PG 76-22 at 1.5 in layer as shown in plans; and all other work outlined in plans, contracts and specification. Drawings, specs and other contract documents may be examined at the Hardee County Purchasing Dept. All technical questions shall be addressed to Craig A. Smith & Assoc., Dan Shonk at ext 6105, [email protected]. Solicitation ITB-26-012-0-2026/HS posted by Hardee County, FL on…
Time remaining
Closes Oct 14, 2026
Related Opportunities

City Sidewalk Project

FY27-GED and Abe Educational Software for Highschool Equivalency and TABE Preparation

FY27 SIR-Spheres Y90 Resin Microspheres

Fiber Optic Spring Hill Drive - 112251

Radiator CAC ASM (13-15)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E7FFA8


