FY 2027 Park Street Drainage Repair Project

Opportunity timeline

In plain English
The City of Walnut Grove wants a contractor to replace a damaged culvert under Industrial Parkway and regrade and stabilize ditch sections along Park Street. The work includes a larger 30-inch RCP culvert, GDOT end sections, foundation backfill, paving, erosion controls, grassing, and sod. Industrial Parkway may be closed for up to three days during construction. Full bid documents and response instructions are posted under event PE-66204-NONST-2027-000000004 on the Georgia Procurement Registry.
1.Replacement of CMP culvert under Industrial Parkway a.Contractor will follow GDOT specifications to replace a damaged culvert under Industrial Pkwy. b.Contractor must use RCP and the culvert size will be increased to 30' c.Culvert will be placed on a minimum of 12' of foundation backfill. d.Culvert will receive GDOT Safety Flared End Sections e.Head and tail ditch to be excavated to match new culvert f.Culvert to be relocated 2' further away from the edge of Park Street. g.Culvert to be backfilled with 57 stone and or compacted GAB within 6' of finished grade. Final 6' to be paved, following GDOT 1401 detail. h.Industrial Pkwy may be closed to traffic during culvert replacement for up to…
Time remaining
Closes Oct 14, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-A63B0A