Opportunity timeline
In plain English
The Navy wants one panel, power distribution unit (NSN 6110-017356110) repaired, upgraded, tested, inspected, and returned to ready-for-issue condition. The contractor must provide the labor, parts, materials, tooling, and testing equipment; proposals should include repair pricing, turnaround time, and any capacity limits. The initial induction period is 365 days, with a possible extension of 730 days, and pricing is requested for up to one unit.
About this opportunity
This RFQ is for repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor…
Time remaining
Closes Oct 13, 2026
Related Opportunities
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-EFECAA


