Opportunity timeline

PostedSep 9, 2026
DeadlineOct 13, 2026

In plain English

Wayne County wants to rehabilitate the Genoa gravity sewer system in Phase I. Work includes about 4,750 linear feet of CIPP lining, 610 feet of relocated sewer, manhole repairs and replacements, and upgrades at several pump stations. The anticipated project cost is $2.1 million to $3.15 million, and a mandatory pre-bid meeting/site visit is scheduled for September 24, 2026. Responding requires free registration on North Carolina’s eVP portal.

About this opportunity

Project Description: Project consists of the following: 1. Rehabilitation of approximately 4,750 LF of 6-18-inch gravity main via CIPP. 2. Relocation of approximately 610 LF of 8-inch gravity main via open cut. 3. Rehabilitation of 19 manholes. 4. Replacement of 3 manholes. 5. Genoa PS: Replacement of upper slide rail brackets and generator like-for-like. Installation of fall protection grating. Replacement of influent bar screen with new grinder. 6. Landfill PS: Installation of vent pipe on wet well and fall protection grating. 7. Grantham Middle and Grantham Elementary PSs: Installation of bypass connections. 8. Highway 117 PS: Installation of flow meter. 9. Project cost range is…

Time remaining

Closes Oct 13, 2026

29Days
:
13Hours
:
47Min
:
28Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-D956D3