Wayne County wants to rehabilitate the Genoa gravity sewer system in Phase I. Work includes about 4,750 linear feet of CIPP lining, 610 feet of relocated sewer, manhole repairs and replacements, and upgrades at several pump stations. The anticipated project cost is $2.1 million to $3.15 million, and a mandatory pre-bid meeting/site visit is scheduled for September 24, 2026. Responding requires free registration on North Carolina’s eVP portal.
About this opportunity
Project Description: Project consists of the following: 1. Rehabilitation of approximately 4,750 LF of 6-18-inch gravity main via CIPP. 2. Relocation of approximately 610 LF of 8-inch gravity main via open cut. 3. Rehabilitation of 19 manholes. 4. Replacement of 3 manholes. 5. Genoa PS: Replacement of upper slide rail brackets and generator like-for-like. Installation of fall protection grating. Replacement of influent bar screen with new grinder. 6. Landfill PS: Installation of vent pipe on wet well and fall protection grating. 7. Grantham Middle and Grantham Elementary PSs: Installation of bypass connections. 8. Highway 117 PS: Installation of flow meter. 9. Project cost range is…
Time remaining
Closes Oct 13, 2026
Related Opportunities

September 14, 2026 ITB 367-OC5472R-12 Sale of 315 Buckhorn Rd

ARS Reflectance Spectrophotometer-Brand Name

Durham Asbestos Abatement Services "Solicitation"

Mobile Equipment Fueling

Magnaflux Demagnetizer Semi Annual Preventative Maintenance
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-D956D3