The City of Perry wants a contractor to excavate and grade part of a regional stormwater pond and improve drainage channels between Stonegate Trail and Rocky Road. The work will coordinate with a separate developer-built pond phase for the future Avion Park subdivision. Attendance at the pre-bid meeting is mandatory on September 22, 2026, at 2:00 p.m. ET in Perry; bid details are posted under event PE-66243-NONST-2027-000000092 on the Georgia Procurement Registry.
About this opportunity
The Flood Improvement Project Phase 2A consists of excavating and grading a portion of the regional inline stormwater pond and improving the drainage channels between Stonegate Trail and Rocky Road. The Phase 2B portion of the pond will be constructed separately by others and will consist of excavating and grading the remaining portion of the pond by the developer of the future Avion Park subdivision. Phase 2A and Phase 2B are anticipated to be constructed concurrently and will require coordination between the Citys contractor and the developers contractor. Together, the completed improvements will provide additional flood storage and improve drainage in Sadie Heights and the surrounding…
Time remaining
Closes Oct 16, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-0F4B18