Opportunity timeline

PostedSep 8, 2026
DeadlineSep 25, 2026

In plain English

The Department of Energy needs a contractor to replace a PLC unit on Boiler 1 at Fermilab. This includes all associated labor, materials, and oversight. Small businesses are encouraged to bid.

About this opportunity

The Subcontractor shall perform all work as described in the Statement of Work titled the, “CUB Boiler 1 PLC Replacement” All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.

Time remaining

Closes Sep 25, 2026

11Days
:
13Hours
:
45Min
:
22Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-146FBF