Opportunity timeline
In plain English
NIST is seeking industry feedback before deciding whether to reissue a project to repair the Building 215 Advanced Measurement Laboratory cleanroom at its Gaithersburg Campus and replace about 1,200 HEPA filters. The work may also include replacing about 70 VAV units, 54 airflow monitors, and 32 exhaust control valves, along with ductwork, controls, testing, balancing, commissioning, and cleanroom certification. The previous plan used 19 phases, with 18 critical outages lasting about nine days each and potentially requiring continuous 24/7 work. This is an information request only, not a contract opportunity or request for bids.
About this opportunity
REQUEST FOR INFORMATION (RFI) BUILDING 215 ADVANCED MEASUREMENT LABORATORY (AML) CLEANROOM REPAIR AND HEPA FILTER REPLACEMENT Solicitation/Reference No.: 1333ND26RNB190014
1. PURPOSE OF THIS REQUEST FOR INFORMATION
The National Institute of Standards and Technology (NIST) is conducting market research pursuant to Federal Acquisition Regulation (FAR) Part 10 and FAR 15.201 to obtain industry feedback concerning the scope, schedule, phasing, cleanroom outage requirements, technical and performance risks, and estimated construction cost associated with the Building 215 Advanced Measurement Laboratory (AML) Cleanroom Repair and HEPA Filter Replacement project. NIST previously solicited this…
Time remaining
Closes Oct 14, 2026
Related Opportunities

Leavenworth VA Decommissioning

WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001

Repair Aircraft Fire Training Facility Homestead Air Reserve Base (harb) FL

Tinker AFB 2026 Multiple Award Construction Contract (MACC)

Grand Coulee Dam, Industrial Area Compressed Air Upgrades, Columbia Basin Proje
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-6442DE