Opportunity timeline

PostedSep 5, 2026
DeadlineSep 30, 2026

In plain English

Cameron County Drainage District No. 5 seeks bids to build two regional detention ponds near Primera, Texas. Work includes concrete outfalls, riprap, low-flow outlets, channel grading, railroad culverts installed by jack and bore, erosion controls, and revegetation. The project requires coordination with Union Pacific Railroad and depends on funding from the Texas Water Development Board.

About this opportunity

The work generally consists of the construction of two (2) regional detention ponds located near Primera, TX. The ponds will include concrete weir outfall structures with stone riprap protection, as well as low flow pipe outlets with headwalls and check valves. Additional work includes minor channel grading as well as installation of additional culverts under the Union Pacific Railroad (UPRR) via jack and bore and construction of concrete riprap headwalls for slope protection. Coordination with the UPRR will be required for all work in UPRR ROW. Erosion and sedimentation control measures will be required along with revegetation of disturbed areas. This contract is contingent upon the…

Time remaining

Closes Sep 30, 2026

16Days
:
11Hours
:
15Min
:
48Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-0CC6A2