Opportunity timeline

PostedSep 4, 2026
DeadlineOct 1, 2026

In plain English

Long Beach Utilities Department is seeking a contractor to rehabilitate the Phase 2 groundwater treatment plant filter gallery. Work includes replacing valves, actuators, piping, electrical components, and coatings; connecting new actuators to SCADA; and repairing filter basin cracks. Solicitation UD-26-358 documents and response instructions are available through Long Beach Buys.

About this opportunity

The work includes removal, disposal and replacement of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; rehabilitation of steel spools; recoating existing surface wash water piping; replacing electrical conduits, struts and junction boxes; connection of new actuators to existing SCADA; repair of cracks in filter basins by injecting polyurethane and associated tasks Point of contact: Wade Depew ([email protected]). Solicitation UD-26-358 from Long Beach Utilities Department. Full documents and how to respond are on Long Beach Buys, the City of Long Beach procurement portal (viewing is public).

Time remaining

Closes Oct 1, 2026

17Days
:
12Hours
:
43Min
:
30Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C9DA32