Opportunity timeline

PostedSep 3, 2026
DeadlineOct 7, 2026

In plain English

The Marblehead Municipal Light Department is seeking a qualified contractor to replace seven 45-foot wooden utility poles and transfer twin 23kV overhead circuits along the Salem Bike Path in Salem, Massachusetts. Work must maintain power during the transfer and use the materials and specifications in Attachment D. Construction must start after November 9, 2026, and finish before December 31, 2026.

About this opportunity

Marblehead Municipal Light Department (MMLD) receives its power supply via twin, 23kV feeders sourced from National Grid’s Railyard substation in Salem, Massachusetts. MMLD assumes ownership for these circuits and their associated infrastructure from National Grid near Ocean Ave in Salem, where it exists as two vertically oriented, overhead circuits in spacer cable configuration above the Salem Bike Path. From the point of demarcation, the circuits span seven, 45-foot, wooden poles before transitioning to an underground configuration to the city limits. MMLD is seeking a qualified contractor to replace the wooden utility poles and transfer the 23kV circuits in sequence to maintain power to…

Time remaining

Closes Oct 7, 2026

23Days
:
10Hours
:
50Min
:
50Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-E2DEC3