Opportunity timeline
In plain English
The Navy is seeking repair and testing of one electrical control panel, part number 06550-00832-102 and NSN 6110-016958455, returning it to ready-for-issue condition. Contractors must provide the facility, labor, parts, tooling, and test equipment, and submit firm-fixed-price or time-and-materials pricing with the proposed repair turnaround time. The initial induction period is 365 days, with a possible extension to two years; option pricing may cover up to one unit.
About this opportunity
This RFQ is for repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor?s facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must…
Time remaining
Closes Oct 5, 2026
Related Opportunities
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-C9D748


