The City of Sugar Land wants a contractor to install two 24-inch steel utility casings by trenchless methods at the US 90A and John Sharp Drive/Owens Road intersection. The work covers about 360 linear feet for a future water line and 303 linear feet for a future wastewater force main, plus pits, traffic control, utility coordination, testing, and restoration. The future water and force-main pipes are not part of this contract.
About this opportunity
The Work consists of furnishing all labor, materials, equipment, supervision, permits, and incidentals necessary to install two 24-inch steel utility casings by trenchless methods at the US 90A and John Sharp Drive/Owens Road intersection in Sugar Land, Texas. The project includes approximately 360 linear feet of 24-inch steel casing for a future water line and approximately 303 linear feet of 24-inch steel casing for a future wastewater force main. The Work includes construction of bore and receiving pits, installation of the steel casings, capping and marking casing ends, utility coordination, traffic control, dewatering as required, excavation and backfill, protection of existing…
Time remaining
Closes Sep 24, 2026
Related Opportunities

New MAB FMS Equipment Shed

Cardio-Pulmonary Booms

Certification of Sterile Compounding Facilities Services

1st Qtr. Bread FY27 - FDC Houston

1ST QTR FY27- Milk - FDC Houston