Pelots Point Road Lakeshore Stabilization

Opportunity timeline

In plain English
The Town of North Hero is seeking qualified contractors to stabilize about 150 feet of shoreline along Pelots Point Road on Lake Champlain in North Hero, Vermont. Work includes encapsulated soil lifts, stone toe protection, plantings, grading, and site restoration. The estimated value is $105,000, and emailed bids are due to Joe Bartlett by 5:00 PM on September 18, 2026.
The Town of North Hero invites qualified contractors to prepare bids for the construction of the Pelots Point Road Lakeshore Stabilization Project located along Lake Champlain in North Hero, Vermont, herein referred to as the Project. The Project includes all work necessary to provide approximately 150 feet of shoreline stabilization measures, including installation of a bioengineered shoreline consisting of encapsulated soil lifts, stone toe protection, plantings, grading, and associated site restoration as shown on the design plans. The intent of the Project is to stabilize shoreline erosion that threatens Pelots Point Road while providing additional water quality and habitat benefits…
Time remaining
Closes Sep 18, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-B002DF