Opportunity timeline

PostedJul 28, 2026
DeadlineSep 14, 2026

In plain English

The project will improve the Shady Pines mobile home park water system in Windham, Vermont. Work includes replacing the old 6,000-gallon pressure tank with two buried 4,000-gallon tanks, adding a 95 GPM booster pump system, and extending water lines. Add/alternate work includes replacing 1,300 feet of water main and 525 feet of water services, plus adding a flushing hydrant.

About this opportunity

A. The project proposes the following work to the water system: • Replacement of the existing 40+ years old 6,000 gallon steel pressure storage tank with 2: 4,000 gallon buried fiberglass storage tanks. • Construction of a new 95 GPM dual-alternating self-priming booster pump system to pressurize the mobile home park distribution system. The existing 6,000 gallon steel pressure tank is pressurized by the 30 gpm well pump. • Construction of a 45 ft extension on the 1.5” PVC well supply line with two buried shut-off valves from the existing water building to the new water tanks. • Construction of 30 ft of 3” PVC suction line from the new water tank to the interior booster pump system. B. The…

Time remaining

Closes Sep 14, 2026

00Days
:
12Hours
:
39Min
:
04Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C72848