Opportunity timeline
In plain English
The City of Cascade Locks wants a firm fixed-price, full-scope design-build team for a solar-plus-battery storage microgrid at its fire station. The system must support the station during outages, operate with the larger grid during normal conditions, and disconnect from the grid during emergencies. Funding is authorized, including a grant from the Oregon Department of Energy; proposals are handled through OregonBuys under solicitation S-X33157-00017870.
About this opportunity
The City of Cascade Locks has issued this Request for Proposals to obtain firm fixed price proposals for full-scope design-build services for a solar plus solar storage microgrid at the Cascade Locks Fire Station. The goal of this project is to construct a resilient on-site solar plus solar storage system to support facility operations during a power outage while offsetting operating costs. The system must provide power to the larger grid system when operating under everyday circumstances. When required, due to an emergency event, the system must island itself from the grid system and continue to provide power to the location. Funding for the complete scope has been authorized by the City…
Time remaining
Closes Oct 2, 2026
Related Opportunities

Hybrid P25 Satellite System equipment

Informing Best Practices for Oregon GRSG Mitigation Program through Review of State Programs

USDA Forest Service Land Management Integrated Resources BPA (LMIR) Green Ridge PCT, Buck and Pile

USDA Forest Service Land Management Integrated Resources BPA (LMIR) Willamette NF, Detroit RD 2026 Reforestation

Western Oregon Service Unit Grounds Maintenance
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-851891

