In plain English

The City of Santa Fe wants to rehabilitate Primary Clarifier #1. Work includes replacing the failed mechanical equipment and electrical control panel, along with concrete and grout repairs, based on the project plans and specifications. The existing equipment dates to 1998 and has extensive corrosion.

About this opportunity

The primary clarifiers were installed in 1998 and have reached the end of their useful life. The coating on the metal equipment has failed resulting is extensive corrosion of the carbon steel. The mechanical system is beyond repair, so this equipment must be removed and replaced. This project proposes to replace the mechanical equipment, replacement of the electrical control panel, and concrete/grout repairs, to restore proper operation and extend the units life as per the attached plans and specifications. Posted by City of Santa Fe, NM on OpenGov Procurement. Sourced from OpenGov Procurement, where plans, addenda, and Q&A are managed.

Time remaining

Closes Sep 30, 2026

16Days
:
11Hours
:
42Min
:
02Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-D0C8EC