Opportunity timeline
In plain English
Athens-Clarke County Transit wants six new Allison H40 EP Energy Storage Systems to replace the batteries in six 2018 Gillig Hybrid 40-foot BRT buses. The price must include on-site programming for each bus, and the units must be delivered to the Transit Maintenance Division in Athens, Georgia, by June 10, 2027. The systems must be exact OEM replacements and include applicable new-unit warranties.
About this opportunity
The awarded vendor shall supply six new Allison H40 EP Energy Storage Systems (ESS) to the Transit Department/ Maintenance Division. The Allison Hybrid ESS units procured will serve as a replacement in six 2018 Gillig Hybrid 40’ low floor BRT transit coaches. The Allison Hybrid ESS units proposed shall be new, and an exact original equipment manufacturers (OEM) replacement for the existing Allison Hybrid ESS in each transit bus. The vehicle identification number, ESS serial number drive unit serial number have been provided for each unit in the specifications section of this IFB to aid prospective vendors in identifying the correct replacement ESS unit. The pricing proposed shall include…
Time remaining
Closes Sep 30, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-759817


