Marshall Street WRF Sand Filter Rehabilitation

Opportunity timeline

In plain English
The City of Clearwater wants to rehabilitate 12 existing sand filters at the Marshall Street Water Reclamation Facility. Work includes equipment and valve repairs or replacements, sodium hypochlorite pumps and piping, a new filter control-panel touchscreen, and upgraded SCADA controls. The contract period is 420 calendar days from the notice to proceed.
Rehabilitate twelve (12) existing sand filters, associated equipment, remove and replace seven (7) Kinetrol pneumatic actuator yokes on 20-inch Butterfly Valves (Filter Cells 1, 2, 7, 8, 11, and 12), flange bolts on 20-inch Backwash Inlet Butterfly Valve (Filter Cell 7, will only be necessary if Contractor confirms the valve is not functioning), two (2) 18-inch backwash pump discharge Check Valves (will only be necessary if Contractor tests and confirms the backwash flow rate is compromised), sodium hypochlorite pumps and associated piping. Other improvements include replacement of the touch screen for the main filter control panel with improved graphics and functionality, and upgrading the…
Time remaining
Closes Oct 8, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-783E20