Downtown to Loop Pressure Zone (PZ) Conversion Project

Opportunity timeline

In plain English
New Braunfels Utilities is seeking qualified firms for construction services to convert the Downtown to Loop pressure zone. The work includes about 5,700 linear feet of 8- to 12-inch water main, a pressure-reducing valve, abandonment of existing piping, traffic control, stormwater protection, restoration, and related work. The project was designed by Parkhill, Inc.
New Braunfels Utilities (“NBU”) invites the submittal of responses to this Request for Proposals (“RFP”) from qualified firms interested in providing construction services in connection with the construction of Downtown to Loop PZ Conversion (the “Project”). The Project has been designed by Parkhill, Inc. The Project includes the following items within its scope: (i) construction of approximately 5,700 linear feet (“LF”) of 8-inch to 12-inch watermain piping by open cut and trenchless methods; (ii) pressure reducing valve (“PRV”); (iii) groutfill abandonment of existing piping; (iv) traffic control; (v) storm water pollution prevention; (vi) restoration; and (vii) all other appurtenances…
Time remaining
Closes Sep 30, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-992DDB