Opportunity timeline

PostedAug 26, 2026
DeadlineSep 24, 2026

In plain English

The Charlottesville-Albemarle Airport Authority is seeking qualified firms to replace a terminal’s existing water-cooled centrifugal chiller with a new air-cooled chiller. The work also includes replacing chilled-water pumps and hydronic accessories, removing the cooling tower and condenser-water pumps, modifying hydronic piping, and making electrical changes. Bid documents, addenda, and submission requirements are available on the airport’s public-notices webpage; responses require a free eVA vendor sign-in.

About this opportunity

The Charlottesville-Albemarle Airport Authority is seeking bids from qualified firms experienced in the construction, installation, and testing of hydronic mechanical piping systems, centrifugal pumps, and HVAC Chiller equipment. The proposed Work includes the following: Replacement of existing water-cooled centrifugal chiller with new air cooled chiller. Replacement of chilled water circulating pumps. Replacement of air separator, expansion tank and other hydronic accessories. Demolition of existing cooling tower and condenser water circulating pumps. Hydronic piping modifications. Electrical system modifications to support installation of new chiller equipment and pumps. *** VISIT…

Time remaining

Closes Sep 24, 2026

09Days
:
21Hours
:
41Min
:
33Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-8C015C