Repair Fire Pump Controllers, B1176, HEF Disposal

Opportunity timeline

In plain English
The Department of Defense wants a contractor to replace two fire pump controllers, remove a legacy foam control panel, install a new preaction/wet-system panel, and remove and properly dispose of a high-expansion foam tank and storage system at Building 1176. The estimated project value is $350,000–$500,000. The full requirements are in the Scope of Work and supporting documents.
The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description. ---------------------------------------------- 25 Aug 26, The purpose of this amendment is to inform the order of magnitude: $350,000- $500,000, and correct the issue date in the combo document.
Time remaining
Closes Sep 28, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-992F41