Opportunity timeline
In plain English
The Navy wants a contractor to repair, overhaul, upgrade, test, and inspect navigation equipment and return it to ready-for-issue condition. Repairs must be completed within 90 days after receipt, with induction ending 365 days after contract award. The contractor must provide its own tooling and testing equipment; early and incremental deliveries are preferred.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Sep 21, 2026
Related Opportunities

Speed Trailers

Blanket,type 6

VRAMS Repair

Receiver,countermea

Receiver,countermea
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-4ACD5F

