The City of Winder is seeking a contractor to install about 9,650 feet of 4-inch high-pressure steel natural gas main, plus smaller gas mains, valves, connections, regulator stations, and related work along Bankhead Highway. The City will provide the gas main materials, valves, fittings, and regulator stations. Bids are due September 15, 2026, at 10:00 a.m. local time at the City of Winder Utilities Department in Winder, Georgia. Bidders must hold a Georgia State Contractor's License.
About this opportunity
BANKHEAD HIGHWAY HIGH PRESSURE NATURAL GAS MAIN EXTENSION The City of Winder (Owner) is requesting Bids for the construction of the following Project: Bankhead Highway High Pressure Natural Gas Main Extension Project Number: 250235 Bids for the construction of the Project will be received at the City of Winder Utilities Department located at 138 Sweetwater Trail, Winder, GA 30680, until September 15, 2026 at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read. The Project includes the following Work: The Project consists of the installation of approximately 9,650 linear feet of 4-inch high pressure steel gas main, 30 linear feet of 4-inch polyethylene gas…
Time remaining
Closes Sep 15, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-00AD29