Opportunity timeline
In plain English
The City of Keller wants a contractor to rehabilitate the 1.0 million-gallon Keller Smithfield elevated storage tank. Work includes replacing interior and exterior coatings, repairing the roof, replacing bolts and gaskets, site and fence work, tree removal and trimming, and installing and connecting an 8-inch waterline and fire hydrant assembly. Kleinfelder posted the opportunity on behalf of the City of Keller; plans, addenda, and bids are managed through CivCast.
About this opportunity
The work (Base Bid) for the Rehabilitation of the
1.0 MG Keller Smithfield EST includes, but is not necessarily limited to, the following major items: Complete replacement of the exterior coating system including the abrasive blasting and containment system. Complete replacement of the wet interior coating including the surface preparation blasting, including removal of sediment from washing operations. Exterior Pipe preparation and coating (Overflow flap valve) Replace Compression Ring, if needed Repair the existing roof plate Remove & replace Bolts and gasket at Floor Manhole Install new Confined Space Signag. Relocate Conduit @ water access Hatch, Dry Access Tube Hatch, & Pedestal Ladder…
Time remaining
Closes Sep 17, 2026
Related Opportunities

Cardio-Pulmonary Booms

Certification of Sterile Compounding Facilities Services

1ST QTR FY27- Milk - FDC Houston

1st Qtr. Bread FY27 - FDC Houston

Forklift
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-712A5A

