Opportunity timeline

PostedAug 14, 2026
DeadlineSep 24, 2026

In plain English

The City of Prescott Regional Airport wants to realign and reconstruct part of Taxiway “F” and Connector “F3” to Airplane Design Group 2 standards. Work includes grading and drainage, utility adjustments, airfield lighting and signage, pavement markings, asphalt removal, and excavation. Contractors must be familiar with work at a Part 139 certificated airport and FAA design standards.

About this opportunity

The City of Prescott Regional Airport, Ernest A. Love Field Taxiway "F" Realignment project will reconstruct a portion of Taxiway "F" and Connector "F3" to Airplane Design Group (ADG) 2 geometric standards including grading and drainage improvements, utility adjustments, lighting and signage improvements, and pavement markings. All in strict adherence to Federal Aviation Administration (FAA) design standards. Major items of work associated with the project include, familiarity and knowledge of working at a part 139 Certificated Airport, removal of asphalt concrete pavement, unclassified excavation materials and airfield lighting. Posted by City of Prescott on OpenGov Procurement. Sourced…

Time remaining

Closes Sep 24, 2026

10Days
:
12Hours
:
41Min
:
15Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-4A77D1