Opportunity timeline

PostedJul 24, 2026
DeadlineSep 30, 2026

In plain English

The Navy wants 30 DR Pulley Bush assemblies for submarine use, under a 100% small-business set-aside. The assemblies must meet specified drawings, materials, marking, testing, and quality requirements. SubCLIN quantities were reduced to 14 and 13, and offers are due July 17, 2026; price, delivery lead time, and past performance will be evaluated.

About this opportunity

3. REQUIREMENTS

3.1 ;Design and Manufacturing - The ;AN/BRA-24 Toughmet Drive Pulley & Bushing Assembly; furnished under this contract/purchase order shall meet the material, mechanical, physical and test requirements as specified on Drawing 8628281-2 Assembly (consisting of Item Numbers 1 thru 4) and Design Change Notice No. 452-22-001 (applicable to drawing 862821) including associated specifications mentioned in this procurement.; 3.1.1 ;The Toughmet Drive Pulley p/n 8628280-2 and Toughmet Collar, Groove p/n 8628296-2 shall be manufactured from CU-NI-SN Alloy, TOUGHMET 3, TS 120U material as specified on the applicable drawing.; 3.1.2 ;The Bushing, Seal p/n RE-B102107 shall be…

Time remaining

Closes Sep 30, 2026

16Days
:
13Hours
:
24Min
:
00Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-8CCC35