Opportunity timeline

PostedAug 17, 2026
DeadlineSep 14, 2026

In plain English

The Navy wants a contractor to repair and upgrade mechanical transmissions to a ready-for-issue condition, including inspection, component repair or replacement, reassembly, and testing. The contractor must provide its own facility, labor, materials, parts, tooling, and test equipment. The required repair turnaround time is 90 days after receipt, with assets accepted within 365 days after contract award.

About this opportunity

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…

Time remaining

Closes Sep 14, 2026

00Days
:
17Hours
:
14Min
:
24Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-CE922B