Opportunity timeline

PostedOct 17, 2025
DeadlineOct 31, 2026

In plain English

The Army wants to build a new industrial compressed air plant at Wright-Patterson Air Force Base in Ohio. This includes two large air compressors, two natural gas heaters, and specialized piping. They are looking for businesses that can handle this construction, and small businesses are encouraged to respond to a market survey by completing a specific form.

About this opportunity

Please review the Market Survey Document within the "attachments" section and complete the required Market Survey Response Form provided within the "links" section. The US Army Corps of Engineers (USACE), Louisville District, is conducting market research to identify potential parties having interest in and capability of performing construction of a new, fully functional, industrial, compressed air plant in the controlled access B18 Complex at Wright-Patterson AFB, including two centrifugal air compressors (4,000 HP), two industrial, natural gas-fired air heaters (18.1 MM BTU/hr / 55 MM BTU/hr), insulated specialty steel distribution piping (schedule 80-120), valves, and all associated…

Time remaining

Closes Oct 31, 2026

47Days
:
14Hours
:
44Min
:
48Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-AA8B38