Bid guide

How to bid on Additive Manufacturing Processes Vendor Qualification for the DEPT of the Army

DEPT of the Army MICloses July 10, 2027

What the Army is buying and why it matters

The US Army Combat Capabilities Development Command Ground Vehicle Systems Center (DEVCOM GVSC) is looking to qualify vendors for additive manufacturing (AM) processes and materials. This is to support the production of vehicle parts, especially for legacy systems where original manufacturing methods are no longer available.

The Army needs to ensure a reliable supply chain for spare parts and is exploring modern, high-strength AM materials. They are interested in methods that can consistently produce parts meeting or exceeding original specifications, focusing on a risk-based qualification framework.

Key dates and what happens at the deadline

This request for information (RFI) was published on July 10, 2026. The deadline for submissions is July 10, 2027, at 12:00 PM ET.

At the deadline, the Army will stop accepting submissions for this RFI. This is not a request for proposal or a guarantee of future work, but an opportunity to provide information that could lead to future opportunities.

Who this opportunity suits

This opportunity is suitable for companies specializing in metal additive manufacturing. This includes modalities such as laser powder bed fusion (LPBF), wire directed energy deposition (W-DED), powder directed energy deposition (P-DED), and binder jet additive manufacturing (BJAM).

The Army is particularly interested in vendors working with steel alloys (e.g., PH17-4, 316L, 42CrMo4) and high-strength aluminum alloys (e.g., Al10MgSi, AlSi7Mg06). Vendors with unique alloy solutions may also propose them, provided additional data is supplied.

How to respond to this RFI

To respond, you need to provide data on the quasistatic mechanical performance of your material and process combination, evidence of build quality, and documentation of process controls and quality management systems. A detailed list of required data is in Appendix A of the original document.

Test data should be provided in Microsoft Excel format. All mechanical testing must be performed by a third-party certified lab, such as ISO17025 or NADCAP. Include your CAGE code with your submission. All documentation should be emailed to [email protected]. You can contact Demetrios Tzelepis at [email protected] for specific concerns.

Practical tips for preparing a competitive response

Carefully review Appendix A for all specific data requirements. Ensure your data clearly demonstrates how your AM process can consistently produce parts that meet or exceed the minimum requirements of legacy drawings. Highlight any certifications your process holds, such as SAE AMS or ASTM specifications.

If you have performed work for other services (e.g., Air Force Research Lab, NAVSEA), be sure to note which documents and provide the corresponding data packages. Clearly document all post-processing conditions and any third parties involved in testing or post-processing, including their certifications. A well-organized and complete submission will make it easier for the Army to evaluate your capabilities.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.