Bid guide
How to bid on Natomas PP5 Construction for the US Army Corps of Engineers
What the agency is buying and why it matters
The U.S. Army Corps of Engineers (USACE) Sacramento District is looking for a contractor to demolish the existing Pumping Plant 5 (PP5) in Sacramento, California. A new pumping plant will be constructed approximately 300 feet up the West Drainage Canal. This new facility will discharge stormwater from the canal into the Sacramento River.
This project is part of the American River Common Features, Natomas Basin Project, specifically supporting levee improvements in Reach B of the Natomas Basin. The new plant will allow for necessary levee features, such as a seepage berm and raised discharge pipes, to be constructed.
Key dates and what happens at the deadline
This solicitation was published on August 18, 2026. The deadline for submissions is September 29, 2026, at 12:00 PM ET. All proposals must be submitted by this time.
It is important to note that amendments 0001, 0002, and 0003 have been issued for this solicitation. Vendors should review all amendments carefully as they may contain important updates or changes to the requirements.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in demolishing existing structures and building new pumping plant facilities. Contractors familiar with water infrastructure projects, particularly those involving stormwater discharge and levee improvements, will find this relevant.
The project is categorized under construction, indicating a need for general contractors or specialized firms in heavy civil construction.
How to respond to this solicitation
To access the solicitation documents, you will need to go to the original source portal. If the first click takes you to the portal's homepage, click the link again to go directly to the bid.
You may need to create a free account on the portal to view all the documents. However, for some bids, an account may not be necessary. Always refer to the full solicitation document for all detailed instructions, clauses, and submission requirements.
Practical tips for a competitive response
Thoroughly review all solicitation documents, including the original Request for Proposal (RFP) and all three amendments (0001, 0002, and 0003). Amendments often contain critical updates or clarifications that can impact your proposal.
Pay close attention to the scope of work, especially regarding the demolition of the old plant and the construction of the new one 300 feet away. Clearly outline your proposed approach, methodology, and timeline for both phases of the project.
Ensure your proposal addresses how your firm will manage the complexities of working near an existing canal and river, and how you will support the broader levee improvement goals in Reach B. Highlight any relevant past performance on similar projects involving water infrastructure or levee work.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from DEPT of the Army; the original posting controls.

